Financiado por la Unión Europea
kit digitalkit digital

Renewal of the Les Colladetes Wind Farm. Project supported by the aid programs for investment in the repowering of wind facilities, in the technological and environmental renovation of hydroelectric power plants up to 10 MW, and in innovative installations for the recycling of wind turbine blades (“Circular Repowering Programs”) under the Recovery, Transformation and Resilience Plan, funded by the European Union – NextGenerationEU.

More than 25 years
producing renewable energy in Catalonia

Since its inception, the Les Colladetes Wind Farm, located in the municipality of El Perelló (Tarragona), has been one of the pioneering renewable energy projects in Catalonia, with 54 wind turbines and a total capacity of 36.6 MW. The park was developed with the aim of reducing dependence on fossil fuel energy sources in the region and contributing to the increase in renewable energy capacity.

1999

Commissioning of Les Colladetes Wind Farm I, with 36 wind turbines and a capacity of 24.75 MW.

2001

Commissioning of Les Colladetes Wind Farm II, with 18 wind turbines and a capacity of 11.88 MW. The entire project was configured with 54 wind turbines and a total capacity of 36.6 MW.

2024

Dismantling of the 54 wind turbines at the Les Colladetes Wind Farm for renewal.

2025

Expected commissioning of the Les Colladetes Wind Farm after its renewal, with 6 wind turbines and a total capacity of 36.6 MW.

Characteristics of the original wind turbines

  • Number of turbines:
    54
  • Unit capacity:
    660 kW
  • Tower height:
    45 m
  • Rotor diameter:
    47 m
  • Technology:
    Doubly-fed asynchronous generator
  • Location:
    Municipality of El Perelló (Baix Ebre, Tarragona)

Renewal Project (Completion expected: 2025)

  • Number of turbines:
    6
  • Unit capacity:
    6.1 MW
  • Tower height:
    120 m
  • Rotor diameter:
    158 m
  • Technology:
    Doubly-fed asynchronous generator
  • Location:
    Municipality of El Perelló (Baix Ebre, Tarragona)
Characteristics of the original wind turbines
Characteristics of the original wind turbines

The wind turbines from the original project, removed during the renewal phase, will be reused through installation in other locations, component repurposing as spare parts, and recycling of materials that cannot be reused.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.