More than 25 years
of renewable energy generation in Catalonia
Since its inception, the Les Colladetes Wind Farm, located in the municipality of El Perelló (Tarragona), has been one of Catalonia’s pioneering renewable energy projects. Originally developed with 54 wind turbines and a total installed capacity of 36.6 MW, the wind farm was designed to reduce reliance on fossil fuel-based energy sources in the region while increasing renewable energy capacity.
Commissioning of Les Colladetes Wind Farm I, featuring 36 wind turbines with a total installed capacity of 24.75 MW.
Commissioning of Les Colladetes Wind Farm II, adding 18 wind turbines with a capacity of 11.88 MW. This expansion completed the project with a total of 54 wind turbines and a cumulative installed capacity of 36.6 MW.
Decommissioning of the 54 wind turbines at Les Colladetes Wind Farm as part of the repowering project.
Expected commissioning of the repowered Les Colladetes Wind Farm, featuring 6 new wind turbines while maintaining a total installed capacity of 36.6 MW.
Technical specifications of the original wind turbines
-
Number of turbines:54
-
Unit capacity:660 kW
-
Hub height:45 m
-
Rotor diameter:47 m
-
Technology:Doubly-fed induction generator (DFIG)
-
Location:Municipality of El Perelló (Baix Ebre, Tarragona)
Repowering project(Completion expected: 2025)
-
Number of turbines:6
-
Unit capacity:6.1 MW
-
Hub height:120 m
-
Rotor diameter:158 m
-
Technology:Doubly-fed induction generator (DFIG)
-
Location:Municipality of El Perelló (Baix Ebre, Tarragona)


The wind turbines from the original project, decommissioned during the repowering process, will be repurposed through relocation to other sites, reuse of components as spare parts, and recycling of non-reusable materials