Renewal of the Les Colladetes Wind Farm. Project supported by the aid programs for investment in the repowering of wind facilities, in the technological and environmental renovation of hydroelectric power plants up to 10 MW, and in innovative installations for the recycling of wind turbine blades (“Circular Repowering Programs”) under the Recovery, Transformation and Resilience Plan, funded by the European Union – NextGenerationEU.

Les Colladetes Wind Farm
El Perelló, Baix Ebre

Enervent

IDAE Renovation Project. From 54 to 6 wind turbines maintaining the same installed capacity.

2024

Removal of the current 54 wind turbines , model Gamesa G47, with an installed capacity of 36.6 MW.

End of 2025

Installation of 6 new GE158 wind turbines with the same installed capacity of 36.6 MW.

Enervent

The renovation of the Les Colladetes Wind Farm achieves:

  • Reduction of environmental and landscape impact, by replacing 54 wind turbines with only 6, while maintaining the same installed capacity.
  • Improvement in energy quality, as the new wind turbines incorporate the latest and most advanced technologies to provide reliability and stability to the electricity grid.
  • Improved energy efficiency, as the project increases energy production due to the superior performance of the new wind turbines.