Removal of the current 54 wind turbines , model Gamesa G47, with an installed capacity of 36.6 MW.
Les Colladetes Wind Farm
El Perelló, Baix Ebre
IDAE Renovation Project. From 54 to 6 wind turbines maintaining the same installed capacity.
2024
End of 2025
Installation of 6 new GE158 wind turbines with the same installed capacity of 36.6 MW.
The renovation of the Les Colladetes Wind Farm achieves:
- Reduction of environmental and landscape impact, by replacing 54 wind turbines with only 6, while maintaining the same installed capacity.
- Improvement in energy quality, as the new wind turbines incorporate the latest and most advanced technologies to provide reliability and stability to the electricity grid.
- Improved energy efficiency, as the project increases energy production due to the superior performance of the new wind turbines.